CF-MLB Jacobs Cylinder Break-In

The President's Message mentioned the completion of cylinder installation, with successful break-in flights on November 13, 19, and 28, totaling 6.7 hours. The break-in procedure involved flying at low altitude to maintain high manifold pressure. The flights were enjoyable, with no noticeable oil consumption, and the ADS-B Performance Report was passed successfully.

My Struggles with a VW Aircraft Engine

In November 2000, I purchased a partially completed Kitfox Classic IV project. After six years of modifications, my first flight ended in an engine failure, leading to a crash. Through extensive repairs and engine upgrades to a VW engine, I addressed multiple issues such as fuel starvation, overheating, and valve problems, ultimately achieving successful flights.