The President's Message mentioned the completion of cylinder installation, with successful break-in flights on November 13, 19, and 28, totaling 6.7 hours. The break-in procedure involved flying at low altitude to maintain high manifold pressure. The flights were enjoyable, with no noticeable oil consumption, and the ADS-B Performance Report was passed successfully.







